Maryland Inter-County Connector

As part of the 1.1M natural gas pipeline relocations in Montgomery County, ULS relocated steel and plastic gas pipelines to ten separate locations. ULS moved 6-20 inch steel pipelines and 4-12 inch plastic pipelines, and installed the steel pipes on bridge overpasses and directional bores of 550 and 530 feet. ULS collaborated professionally with both Intercounty Constructors and MD200 Constructors for phases A and B of this project.